Hempstead, Kent · ME7
Specifying access control for a server room in Hempstead
Concentrated, business-critical equipment in a single small space makes server rooms a target for both deliberate sabotage and simple unauthorised tampering that can cause disproportionate disruption. This page sets out what a Hempstead server room should be asking for, and where electric strike lock systems fit into it.
- Sector: server rooms
- Lead service: access control
- Exposure: Continuous exposure, since server rooms typically operate around the clock regardless of the wider building's hours.
Primary risk
Concentrated, business-critical equipment in a single small space makes server rooms a target for both deliberate sabotage and simple unauthorised tampering that can cause disproportionate disruption.
First priority
Access control with individually logged credentials
Common pitfall
Fitting a keypad with a single shared code that everyone in the building knows, which removes any real accountability from the access control system.
Reading the risk honestly
Concentrated, business-critical equipment in a single small space makes server rooms a target for both deliberate sabotage and simple unauthorised tampering that can cause disproportionate disruption.
Exposure window: Continuous exposure, since server rooms typically operate around the clock regardless of the wider building's hours.
The role of electric strike lock systems
An electrically releasable striking plate fitted in place of a standard door keep, allowing a mechanical latch or bolt to be released remotely while keeping the door mechanically locked otherwise.
- Doors where a visible maglock housing is not wanted
- Doors needing to remain mechanically locked through a power failure
What we would put in first, and why
- Access control with individually logged credentials
- A shared key gives no accountability; an auditable log of who entered and when is what most information security policies actually require.
- Environmental monitoring for temperature and humidity
- Server rooms are as vulnerable to environmental failure as to intrusion, and both can cause equally serious disruption.
What that approach will not do
Better to hear this before the order than after a claim.
- Configuration between fail-safe and fail-secure has to be specified correctly at install, since changing it later usually means replacing the strike.
The obligation behind the specification
This is an obligation that changes the specification for server rooms, not an optional extra.
- Many organisations' own information security policies specify restricted, auditable access to server and comms rooms
The other route
- Magnetic lock
- Instant fail-safe release without dependence on a mechanical latch condition is preferred.
What usually goes wrong first time
Fitting a keypad with a single shared code that everyone in the building knows, which removes any real accountability from the access control system.
The support call this sector makes most: new CCTV equipment not compatible with existing analogue cabling
Once a system has been in a while, understand why a CCTV upgrade is not working with existing cables is a common reason for a server room to ring.
Usually it comes down to power supply mismatch, newer cameras sometimes have different voltage or current requirements from the equipment they are replacing.
Before booking anyone, check the age and quality of existing cabling against the new equipment's requirements.
Local notes for Hempstead
Property around Hempstead Valley Shopping Centre is largely 1970s estates and newer Hempstead Valley housing, which is worth saying on the phone so we arrive with the right access equipment.
Hempstead questions we get asked
Specifying access control for a server room in Hempstead
Local detail for Hempstead
- Handover includes a walk-through of how the system is used
- Faults diagnosed before parts are ordered
- Cabling, containment and making good carried out in-house
Survey first, specification second
We will explain why each item is on the list. If something cannot be justified, it should not be on your quotation.
Speak to an engineerGet Your Free Quote
Just 3 quick details, no email needed to start.